Page 4 - Burstlining
P. 4
LUDWIG PFEIFFER
➢ Pipeline and sewer construction in all nominal diameters, pressure stages and materials
➢ Trenchless rehabilitation of pipeline and sewer systems, including assessment, fault detection,
needs analysis, compilation of rehabilitation plans and subsequent repair
➢ Buildings and plants as general contractor for planning and construction, including the
commissioning of complete systems (process engineering, mechanical equipment and process
measurement and control technology)
➢ Microtunnelling from DN250mm up to OD3000mm
➢ Facility management for systems outside of buildings, with 24-hour repair service
➢ Installation of all technical equipment
➢ Trade in pipes, fittings, valves and accessories
➢ Project management, acting as general contractor on infrastructure projects worldwide
Dipl.-Ing. M. 12/01/2016
Koroschetz