Page 4 - Burstlining
P. 4

LUDWIG PFEIFFER












         ➢     Pipeline and sewer construction in all nominal diameters, pressure stages and materials



         ➢     Trenchless rehabilitation of pipeline and sewer systems, including assessment, fault detection,
               needs analysis, compilation of rehabilitation plans and subsequent repair



         ➢     Buildings and plants as general contractor for planning and construction, including the
               commissioning of complete systems (process engineering, mechanical equipment and process
               measurement and control technology)



         ➢     Microtunnelling from DN250mm up to OD3000mm



         ➢     Facility management for systems outside of buildings, with 24-hour repair service



         ➢     Installation of all technical equipment



         ➢     Trade in pipes, fittings, valves and accessories



         ➢     Project management, acting as general contractor on infrastructure projects worldwide




  Dipl.-Ing. M.                                                                                                                      12/01/2016
  Koroschetz
   1   2   3   4   5   6   7   8   9